Placeholder Image

字幕列表 影片播放

  • to increase production.

  • Dave wants to upgrade the trauma lt's rollers and to stay on his gold target.

  • The fix must be finished before tomorrow morning.

  • You know, we got a lot of gold.

  • We gotta get the short time period left.

  • So putting these on up production hope will get the gold in the sluice.

  • These they're too small.

  • So what we've done is we've gone to the big ones.

  • The trauma ll sits on four rollers which dictates how fast the drunken turn on the weight of paydirt it can carry.

  • The bigger rollers should be able to meet Dave's 120 tons.

  • And our target.

  • These will go in much bigger, bigger bearings, bigger shafts and a bigger bushing with the rollers.

  • Holding trauma can now turn twice as fast.

  • Your toe hit Dave's targets of 120 tons an hour.

  • The wash plant needs double the amount of PE death.

  • The new dawn has come, so hopefully it brings us blessings.

  • Way Got two excavators, No mountains.

  • With these two machines, the team can now process an acre of ground every four days.

  • But the operation only has one rock truck and driver Kasey is under pressure.

  • Just gonna stand with plants.

  • And with all day long, it's the whole operation now has to double production.

  • All right, guys, look, This is how he's cut.

  • Three acres, 39.6.

  • That's only 13 ounces per acre.

  • Way didn't kill it.

  • Okay, so now we move to Willie Brown's cut.

  • So we did two acres at Willie Brown's cut 21.2 ounces.

  • The good news is the first acre, the dredge edge cut.

  • We're almost 30 ounces you guys.

  • Now we're turning it around.

  • The new dread judge cut has added over $45,000 to their gold total.

to increase production.

字幕與單字

單字即點即查 點擊單字可以查詢單字解釋

B1 中級

戴夫的新設備將使黃金產量翻倍!| 淘金熱:戴夫-都靈的失落礦區 (Dave's New Piece Of Equipment Will Double Production Of Gold! | Gold Rush: Dave Turin's Lost Mines)

  • 4 0
    林宜悉 發佈於 2021 年 01 月 14 日
影片單字